You have no items in your shopping cart.

30 Metres Led Multi Colours RGB String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

Best In Quality | Top Selling Item

£24.99 ex. VAT
£59.99 ex. VAT
In stock
+ -
Colour Multi Colours
Brand Alpha Lights
Indoor/Outdoor usage Outdoor, Indoor
Special feature Energy Efficient, Timer, Waterproof
Light source type LED
Power source Corded Electric
Light colour Multicolor
Theme Space, Floral
Occasion Christmas, Wedding
Style Traditional

About this item

  • Fairy Lights: 300LED Multi Colours (RGB) Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 30m Light length & 10m Lead wire.
  • Low Voltage Kids Pets Safe Design. Safe Indoor & Outdoor. No risks of electric shocks. The IP44 rated Adapter is uniquely shaped and sockets with covers/flaps may not close fully when plugged in. Please check your outdoor socket if you plan to use it.
  • 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination
  • 8 Hour Timer: This function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exactly same time the following days.

 30 Metres Led Multi Colours RGB String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes

2

Why choose Alpha Lights LED fairy light?

2 10m

Timer Function

The time function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exact same time the following days.

10M Lead

Massive 10M Extension Cable. Plug to the 1st bulb

8 Controllable Functions with Memory

Combination, In Waves, Sequential, Slo-Glo,Chasing/Flash, Slow Fade, Twinkle/Flash, Steady on.

Perfect for anyone wanting to use fairy lights indoor and outdoor

comibine

Package Includes:

1X String lights

1X UK Power supply 31V

1X User's manual

Technical Details

Write your own review
  • Only registered users can write reviews
*
*
  • Bad
  • Excellent
*
*
*

 30 Metres Led Multi Colours RGB String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes

2

Why choose Alpha Lights LED fairy light?

2 10m

Timer Function

The time function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exact same time the following days.

10M Lead

Massive 10M Extension Cable. Plug to the 1st bulb

8 Controllable Functions with Memory

Combination, In Waves, Sequential, Slo-Glo,Chasing/Flash, Slow Fade, Twinkle/Flash, Steady on.

Perfect for anyone wanting to use fairy lights indoor and outdoor

comibine

Package Includes:

1X String lights

1X UK Power supply 31V

1X User's manual

Technical Details

Free Delivery
12 Months Warranty
Top Quality Products
Certified Refurbished Phone & Tech
Secure Payments
30 Days Money Back Guaranteed
24/7 Live Chat Support
Hassle Free Returns